It was dark when I got to the Church, but the parking lot has been paved and the sidewalk by the building put in.
This is just inside the frount door. All the tile is down in this area.
The elevator is going in. They already used it to carry things upstairs.
Alot of the rooms have the ceiling tile finished.
The doors are all stained and installed.
Floor tile is finished in the youth room.
The divider is up in the Childrens Church room.
A couple of the men were putting up ceiling tile in the nursery. That's Ted up top and JohnE below.
The bookcases have been installed in the offices.
They got a great deal on some exercise equipment, so it is sitting on the upper deck.
Windows are in the courts upstairs. They decided to make the doors smaller also.