It's been awhile since I posted, I'll try to do better in the future. Above you can see that the tile in the fellowship hall has been finished.
The main electrical panel in the back room has been buttoned up. A lot of juice will flow trough here.
Many of the doors have been hung. These double doors lead into the youth room. Lynne still says she wants these doors.
The day I was there the AC crew was hooking up the controls to the AC units around the building. This is the control unit in the front utility room.
The baptistry has been framed in. You can see that she "dunker" stands behind and doesn't get into the water with the "dunkee".
And the glass doors have been installed at the front entrance. I'll post more soon.
Saturday, November 15, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Glad to see the progress.
Post a Comment