All the A/C ducts are in, waiting on the suspended ceilings to be installed. Our oldest boy worked this summer for the company that is installing the A/C system. Those ducts may be some of his handiwork.
This baptistery looks mighty narrow. Do you think John E will fit in there?
My wife really likes these doors. There are a lot of them waiting to be installed.
The framework above the stage is going in. The picture is dark but you might be able to see the steel beam across the front.
This picture shows one area that is trimmed out and painted. The color is a light tan. Lynne calls it coffee with a whole lot of cream.