If the load you're trying to get out of the back of the pick-up is more than your forklift can lift, it may require a little redneck ingenuity.
Several of the exterior doors were installed but chained shut.
The electrical work has begun. This is one of the switch boxes in one of the adult classrooms.
The brick and rock on the exterior of the building looks very nice.

1 comment:

Grandpa said...

I am surprised that code allows non-metalic cable in a building this size.