After lunch on Saturday, the wife and I decided to run some errands and go take some pictures at the Church. The first thing I noticed when we drove up was that the bricks had been delivered. I believe there will also be some rock of the exterior.I was told to take a picture of the door, so here is a picture of the door. It keeps the site secure at night I guess.
This is really cool. There are Bible verses written on the studs through out the building. Just one of the steps in committing this building to serve God's purposes and expanding His kingdom.
The crew was at work on the framing when we arrived. Here two of the guys are on a lift to help put up the ceiling joists.
Another couple of guys were cutting wood to length to be nailed up later.
The other framers were working at the other end of the building. I believe these are the 4th-6th grade classrooms.
This last picture is in the youth room. You can see that the spray foam has been sprayed into the walls already. There is a 2x6 wall plus a 2x4 wall filled with foam. It should be well insulated, I've been very happy with the foam Jason sprayed in our attic.
Sunday, January 20, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
I am glad you are getting some pictures posted.
Post a Comment