Monday, October 6, 2008

Thursday, Oct 2

We are working on pulling the wires to all the electric panels in the Church. They all originate in this utility room at the back of the building. The wires we ran Tuesday night are hanging to the left in this picture.
This is the other end of the 315 foot run we pulled Tuesday night.
The electric company came in on Wednesday and set the transformer behind the building.
These are the cables waiting to be installed Thursday night.
We laid the cables out into the hall from outside.
Here is the crew getting the cables ready for the first pull of the evening. We ended up pulling 2 runs each about 220 feet long.
The framing on the stage is coming along. The black boxes are for the rear projection screens.
In this close up you can see the baptistry in the back of the stage.
And finally, the cabinets are going in the kitchen.

Thursday, October 2, 2008

Thursday, Sept 25

They have been doing a little tile work at the new Church.  These first two pictures are in one of the frount bathrooms.

The picture above is in the kitchen.
They are building the boxes on the stage for the rear projection screens.  They will also add some walls to the back of the stage.