All of the lights are installed over the main room. The black ceiling really disappears with the lights on.
One of the Church members is installing the metal railing around the upper deck. You can also see the mounts for basketball goals off to one side.
Instead of sheetrock around the gym area they installed particle board. Brother Flint decided to check it for strength. He's a "healthy" man but they say he just bounced off.
The frame for the suspended ceiling is being installed. This room has also been painted.
This is the paint job in the youth hall and all the class rooms. Either that or someone had a terrible accident with a chain saw.
Here is an overview of the main room. The stage is coming along nicely. The orange boxes on the left are ceramic tile and all the white boxes on the right are the acoustic ceiling tiles.
Another view of the stage from the side.
Friday, August 29, 2008
Tuesday, August 5, 2008
Tue, August 5
All the A/C ducts are in, waiting on the suspended ceilings to be installed. Our oldest boy worked this summer for the company that is installing the A/C system. Those ducts may be some of his handiwork.
This baptistery looks mighty narrow. Do you think John E will fit in there?
My wife really likes these doors. There are a lot of them waiting to be installed.
The framework above the stage is going in. The picture is dark but you might be able to see the steel beam across the front.
This picture shows one area that is trimmed out and painted. The color is a light tan. Lynne calls it coffee with a whole lot of cream.
This baptistery looks mighty narrow. Do you think John E will fit in there?
My wife really likes these doors. There are a lot of them waiting to be installed.
The framework above the stage is going in. The picture is dark but you might be able to see the steel beam across the front.
This picture shows one area that is trimmed out and painted. The color is a light tan. Lynne calls it coffee with a whole lot of cream.
Subscribe to:
Posts (Atom)